How to Choose a Building Inspector in Brisbane (2026 Stage Inspection Guide)

Building in Brisbane? Learn how to choose the right independent building inspector for your new home. A 2026 guide covering stage inspections, timing, reports and what to look for.

2/8/20262 min read

How to Choose a Building Inspector in Brisbane (2026 Guide)

Building a new home in Brisbane is one of the biggest investments you’ll make.

If you’re considering independent stage inspections, you’re already thinking ahead. But not all building inspectors operate the same — and choosing the right one can make a significant difference during construction.

Whether your home is at slab, frame, brickwork or nearing practical completion, selecting the right independent building inspector in Brisbane ensures each stage is properly reviewed before the next trade proceeds.

What Does a Building Inspector Do During a New Build?

An independent stage inspection typically includes:

  • Reviewing structural elements at each stage

  • Checking workmanship against QBCC tolerances

  • Assessing compliance with NCC requirements

  • Reviewing waterproofing before tiling

  • Identifying defects before they’re covered

The purpose isn’t to create conflict — it’s to provide verification and documentation while the build progresses.

1. Choose an Inspector Who Specialises in New Builds

Pre-purchase inspections and construction stage inspections are very different.

Stage inspections require understanding of:

  • Slab set-out and articulation

  • Frame tolerances

  • Brick overhang limits

  • Waterproofing compliance (AS 3740)

  • Construction sequencing

An inspector experienced in Brisbane new builds understands what typically goes wrong at each stage.

2. Make Sure They Guide You on Timing

Booking at the correct stage is critical.

For example:

  • Frame inspections must occur before insulation and sheeting

  • Waterproofing inspections must be completed before tiling

  • Practical completion inspections should be done before handover

An experienced Brisbane building inspector will guide you on timing — not just accept a booking without checking.

3. Consider Communication and Availability

You should be able to:

  • Call and ask questions

  • Understand what the findings mean

  • Receive practical explanations

  • Clarify what is major vs minor

Clear communication reduces stress and helps you deal with your builder confidently.

4. Local Knowledge Matters in Brisbane

Brisbane builds commonly involve:

  • Reactive soil conditions

  • Heavy rainfall exposure

  • Brick veneer construction

  • Slab articulation joints

  • Rapid trade sequencing

Local experience improves inspection accuracy and relevance.

Is It Worth Getting Stage Inspections on a New Build?

Many homeowners assume the builder’s internal checks are enough.

While site supervisors oversee construction, they are not independent.

Independent stage inspections provide:

  • A second set of eyes

  • Documentation during construction

  • Early identification of issues

  • Greater confidence before progressing to the next stage

For most homeowners, the cost of inspections is small compared to the overall build investment.

Frequently Asked Questions

Do I need stage inspections if my builder has supervisors?

Supervisors manage timelines and trades. Independent inspections provide verification from a separate party.

How many stage inspections should I book?

Common stages include:

  • Pre-slab

  • Frame

  • Waterproofing

  • Practical Completion

Will this cause tension with my builder?

Professional reports presented respectfully are typically handled without issue.

Final Thoughts

Choosing a building inspector in Brisbane isn’t about finding the cheapest option.

It’s about:

  • Experience

  • Timing

  • Report quality

  • Communication

  • Local knowledge

If you’re building in Brisbane and want guidance on when to book your next stage inspection, feel free to reach out for advice.

If there’s a specific stage you’d like to learn more about, click the link below to explore that section on our blog.

Pre Slab

Frame Stage

Enclosed Stage

Fixing Stage

Practical Completion / Handover